• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Wastegate Solenoid.
PRIMARY FUEL LINE REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  941    942    943    944    945  946  947    948    949    950    951  
img
.
TM 5-3805-298-23-2
0209
WASTEGATE SOLENOID INSTALLATION CONTINUED
NOTE
Install tiedown strap as noted during removal.
4. Connect wastegate solenoid wiring harness connector (Figure 11, Item 3) on engine control wiring harness
(Figure 11, Item 1).
5. Install new tiedown strap (Figure 11, Item 2) on wastegate solenoid wiring harness connector
(Figure 11, Item 3).
Figure 11. Wastegate Solenoid Wiring Harness Connector.
0209
END OF TASK
FOLLOW-ON TASKS
000209
1. Install right engine access panel (WP 0348).
2. Install left engine access panel (WP 0350).
3. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0209-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.