• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Exhaust Hose.
Figure 16. Arctic Heater Wiring Harness.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  409    410    411    412    413  414  415    416    417    418    419  
img
.
TM 5-3805-298-23-4
0402
INSTALLATION CONTINUED
000402
8. Install hose (Figure 15, Item 5) and clamp (Figure 15, Item 4) on fitting (Figure 15, Item 3).
9. Apply sealing compound to threads of elbow (Figure 15, Item 2).
10. Install fitting (Figure 15, Item 3) on elbow (Figure 15, Item 2).
11. Install elbow (Figure 15, Item 2) on arctic heater fitting (Figure 15, Item 1).
Figure 15. Fuel Connection.
0402
0402-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.