• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Fuel Connection.
ARCTIC HEATER HOSE AND FITTING REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  410    411    412    413    414  415  416    417    418    419    420  
img
.
TM 5-3805-298-23-4
0402
INSTALLATION CONTINUED
000402
NOTE
Route cables and install electrical connections as noted during removal.
12. Connect arctic heater wiring harness (Figure 1, Item 3) and install new tiedown strap (Figure 1, Item 2) on
arctic heater (Figure 1, Item 1).
Figure 16. Arctic Heater Wiring Harness.
0402
END OF TASK
FOLLOW-ON TASKS
000402
1. Fill engine coolant (WP 0228).
2. Install right ladder and right lower cab access panels (WP 0347).
3. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0402-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.