Figure 4. A/C Evaporator.
A/C HIGH-PRESSURE HOSE AND LINE REPLACEMENT

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  512    513    514    515    516  517  518    519    520    521    522  
img
. . .
TM 5-3805-298-23-4
0411
INSTALLATION CONTINUED
NOTE
Remove caps from all hose ends.
Install and route hoses as noted during removal.
3. Install two new O-rings (Figure 6, Item 2). A/C hoses (Figure 6, Item 3), and tube nuts (Figure 6, Item 1) on
cab.
Figure 6. A/C Hoses.
0411
END OF TASK
FOLLOW-ON TASKS
000411
1. Install heater coil (WP 0421)
2. Install left lower cab access panels (WP 0347)
3. Install left engine access panel (WP 0350)
4. Charge air conditioning system (WP 0405).
5. Verify correct operation of machine (TM 5-3805-298-10).
END OF TASK
END OF WORK PACKAGE
0411-5/(6 blank)