TM 55-607/NAVSEA OP 3221 Rev 2
Figure 9-49. Completion of flooring prior to stowage of additional tiers of bombs (hull blocking technique).
and shored at the hull, whereupon the stowage pattern is
(e) Block stowage of 500-pound bombs in
repeated. Details of the securing structure erected at
holds bisected by the shaft alley is illustrated in figure 9-
50. The unit loads are stacked two high, floored over,
9-59