TM 55-607/NAVSEA OP 3221 Rev 2
bulkhead. lb level the stow and provide a flush bearing surface for ensuing rows, a securing structure of the required
thickness can be constructed parallel to the heat bulkhead. Following rows are loaded athwartships in direct alignment.
Voids should be planned henceforth to occur in the center of the hold and secured with full-block structures.
Figure 9-71. Stowing and securing of the CBU-55/B, tween deck No. 3 (swealboard blocking technique).
9-91