• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Swing Cushion Valve.
Figure 2. Pilot Controls Wiring Harness Tiedown Straps.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  688    689    690    691    692  693  694    695    696    697    698  
img
. .
14
TM 5-2420-231-23-2
0187
FIELD MAINTENANCE
-
PILOT CONTROLS WIRING HARNESS REPLACEMENT
0187
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
Tool Kit, General Mechanic's
WP 0369
0
0
(WP 0376, Item 117)
WP 0370
0
WP 0374 (Group Number 0316)
Materials/Parts
0
Rag, Wiping (WP 0375, Item 25)
Equipment Conditions
0
Tag, Marker (WP 0375, Item 33)
Backhoe control tower boots removed
0
0
Tiedown Strap (WP 0375, Item 35)
(WP 0287)
0
Personnel Required
Estimated Time to Complete
Two
4.2 hr
0
0
REMOVAL
0187
NOTE
Tag and mark all electrical connectors to aid in installation.
1. Remove four bolts (Figure 1, Item 2) and cover (Figure 1, Item 1) from right control tower (Figure 1, Item 3).
Figure 1. Cover.
0187
0187-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.