5. Connect three ground cables (Figure 5, Items 12, 11, and 8) and install nut (Figure 5, Item 9) on stud
(Figure 5, Item 10).
6. Connect four 24-V cables (Figure 5, Items 1, 7, 2, and 6) and install nut (Figure 5, Item 3) on junction block
(Figure 5, Item 4).
7. Position rubber boot (Figure 5, Item 5) on terminal.
Figure 5. 24-V Cables.
0198
8. Install equalizer cover (Figure 6, Item 3), washer (Figure 6, Item 4), and bolt (Figure 6, Item 5) on machine.
9. Install two washers (Figure 6, Item 2) and bolts (Figure 6, Item 1) on equalizer cover (Figure 6, Item 3).
Figure 6. Equalizer Cover.