TM 5-2420-231-23-2
0198
REMOVAL CONTINUED
8. Remove bolt (Figure 4, Item 2), lockwasher (Figure 4, Item 3) and disconnect 24-V cable (Figure 4, Item 4)
from NATO slave receptacle (Figure 4, Item 1). Discard lockwasher.
9. Remove 24-V cable (Figure 4, Item 4) from machine.
10. Remove bolt (Figure 4, Item 7), lockwasher (Figure 4, Item 6) and disconnect ground cable (Figure 4, Item 5)
from NATO slave receptacle (Figure 4, Item 1). Discard lockwasher.
11. Remove ground cable (Figure 4, Item 5) from machine.
Figure 4. NATO Slave Receptacle.
0198
END OF TASK
CLEANING AND INSPECTION
0198
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0198
NOTE
Install wires as tagged and marked during removal.
1. Position ground cable (Figure 4, Item 5) on machine.
2. Connect ground cable (Figure 4, Item 5) and install new lockwasher (Figure 4, Item 6) and bolt (Figure 4,
Item 7) on NATO slave receptacle (Figure 4, Item 1).
3. Position 24-V cable (Figure 4, Item 4) on machine.
4. Connect 24-V cable (Figure 4, Item 4) and install new lockwasher (Figure 4, Item 3) and bolt (Figure 4, Item 2)
on NATO slave receptacle (Figure 4, Item 1).