TM 5-2420-231-23-3
0237
INSTALLATION CONTINUED
37. Connect two hoses (Figure 23, Item 2) to tubes (Figure 23, Item 1) on machine.
38. Connect two hoses (Figure 23, Item 2) to tubes (Figure 23, Item 4) on machine.
NOTE
Install tiedown straps in location and quantity noted during removal.
39. Install new tiedown straps (Figure 23, Item 3) on hoses (Figure 23, Item 2).
Figure 23. Hoses.
0237
40. Install cap on hydraulic tank (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE