TM 5-2420-231-23-3
0291
INSTALLATION CONTINUED
NOTE
Route lines as noted during removal.
8. Install three brackets (Figure 12, Items 6, 5, and 1), two nuts (Figure 12, Item 4), and bolts (Figure 12, Item 2)
on swing tower chassis (Figure 12, Item 3).
Figure 12. Hose Brackets.
0291
9. Lightly grease pin (Figure 13, Item 2).
10. Install boom latch (Figure 13, Item 1), pin (Figure 13, Item 2), two washers (Figure 13, Item 4), and retaining
rings (Figure 13, Item 3) on backhoe swing tower chassis (Figure 13, Item 5).
Figure 13. Boom Latch.
0291
END OF TASK