• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 59. Floor Grommet.
Figure 63. Steering Column Cover.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  800    801    802    803    804  805  806    807    808    809    810  
img
.
TM 5-2420-231-23-3
0327
INSTALLATION CONTINUED
40. Connect harness connector (Figure 61, Item 2) to FNR switch (Figure 61, Item 3).
NOTE
Install wires as tagged and marked during removal.
41. Connect harness connector (Figure 61, Item 1) to connector (Figure 61, Item 4).
Figure 61. FNR Switch Connection.
0327
42. Install cover (Figure 62, Item 1) on instrument panel (Figure 62, Item 5).
43. Connect harness connector (Figure 62, Item 3) to powershift control module (Figure 62, Item 4) and tighten
bolt (Figure 62, Item 2).
44. Install powershift control module (Figure 62, Item 4) and two screws (Figure 62, Item 6) on cover
(Figure 62, Item 1).
Figure 62. Powershift Control Module Connection.
0327
0327-45


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.