TM 5-2420-231-23-3
0327
INSTALLATION CONTINUED
NOTE
Install tiedown straps in quantity and location noted during removal.
26. Connect hose (Figure 57, Item 4) to brake master cylinder reservoir (Figure 57, Item 6) and tighten clamp
(Figure 57, Item 5).
27. Connect hose (Figure 57, Item 8) on brake master cylinder reservoir (Figure 57, Item 6) and tighten clamp
(Figure 57, Item 7).
28. Install power cable (Figure 57, Item 9) and nut (Figure 57, Item 2) on bulkhead connector (Figure 57, Item 10).
29. Position boot (Figure 57, Item 1) on bulkhead connector (Figure 57, Item 10).
30. Install new tiedown straps (Figure 57, Item 3) on hose (Figure 57, Item 4).
Figure 57. Upper Front Bulkhead Connections.
0327