TM 5-2420-231-23-3
0327
INSTALLATION CONTINUED
36. Route powershift harness (Figure 59, Item 1) through opening in floor (Figure 59, Item 2).
37. Install grommet (Figure 59, Item 3) on floor (Figure 59, Item 2).
Figure 59. Floor Grommet.
0327
38. Connect bulkhead connector (Figure 60, Item 2) to bulkhead and tighten bolt (Figure 60, Item 1).
NOTE
Install tiedown straps in location and quantity noted during removal.
39. Install new tiedown straps (Figure 60, Item 3) on steering column (Figure 60, Item 4).
Figure 60. Cab Interior Bulkhead Connection.
0327