TM 5-2420-231-23-3
0327
INSTALLATION CONTINUED
NOTE
Install backhoe control tower tilt release handles in position noted during removal.
76. Install two backhoe control tower tilt release handles (Figure 78, Item 3) and four bolts (Figure 78, Item 4) on
right backhoe control tower (Figure 78, Item 2).
77. Install retaining plate (Figure 78, Item 1) and two bolts (Figure 78, Item 5) on right backhoe control tower
(Figure 78, Item 2).
Figure 78. Right Joystick Tower Tilt Release Handles.
0327