• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Measuring Frequency/Duty Cycle
TORQUE LIMITS

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1085    1086    1087    1088    1089  1090  1091    1092    1093    1094    1095  
img
.
TM 5-2420-231-23-3
0370
RELAY INSPECTION AND TESTING
0370
1. Inspecting Relays
a. Check for bent or damaged pins.
b. Check for burned or damaged relay case.
2. Testing Relays
NOTE
When testing relays, always refer to the circuit diagram printed or stamped on relay case.
A 9V battery also may be used to actuate a 12V relay.
Using a multimeter, check for continuity across relay coil.
Mini Relay
Check for continuity between terminals 85 and 86.
Micro Relay
(1) Check for continuity between terminals 1 and 2.
(2) Using a multimeter, check open or closed contacts within relay.
Mini Relay
(1) With relay actuated, check for continuity between terminals 87 and 30.
(2) With relay not actuated, check for continuity between terminals 87a and 30.
Micro Relay
(1) With relay actuated, check for continuity between terminals 5 and 3.
(2) With relay not actuated, check for continuity between terminals 4 and 3.
Figure 20. Relay Schematics.
0370
END OF TASK
FOLLOW-ON TASKS
0370
Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE
0370-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.