• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL PMCS PROCEDURES
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INCLUDING LUBRICATION INSTRUCTIONS

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  118    119    120    121    122  123  124    125    126    127    128  
img
TM 5-3805-255-14
0012
GENERAL PMCS PROCEDURES CONTINUED
CAUTION
Operation is allowable with Class I and Class II leakage, EXCEPT for fuel, where NO
leakage is allowed. WHEN IN DOUBT NOTIFY YOUR SUPERVISOR. When operating
with Class I or Class II leaks, check fluid levels more frequently. Class III leaks must be
reported immediately to your supervisor. Failure to do so will result in damage to loader
and/or components.
NOTE
Notify your supervisor of any leaks you cannot fix.
Leakage Definitions for PMCS
Class I - Leakage indicated by wetness or discoloration, but not great enough to form
drops.
Class II - Leakage great enough to form drops, but not enough to cause drops to drip from
the item being checked/inspected.
Class III - Leakage great enough to form drops that fall from the item being checked/
inspected.
END OF WORK PACKAGE
0012-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.