TM 5-3805-255-14
0053
INSTALLATION CONTINUED
5. Position new gasket (Figure 9, Item 4) on planetary cover (Figure 9, Item 3) being careful to align bolt holes.
6. Position cover (Figure 9, Item 3) and gasket (Figure 9, Item 4) assembly on carrier assembly (Figure 9, Item 2);
align bolt holes and install eight bolts (Figure 9, Item 1). Tighten bolts to 105 to 115 lb-ft (142 to 156 Nm).
Figure 9. Planetary Cover Installation.
0053
7. Fill planetary hub with recommended lubricant (WP 0018).
8. Install new O-ring (Figure 10, Item 3) on drain plug (Figure 10, Item 2) and install drain plug in hole. Tighten
drain plug to 35 lb-ft (47 Nm).
9. Check front axle fluid level and add gear lubricant as necessary (WP 0018).
10. Install front tire.
Figure 10. Drain Plug Installation.
0053
END OF TASK
END OF WORK PACKAGE
0053-6