TM 5-3805-255-14
0073
INSTALLATION CONTINUED
00073
3. Install bolt (Figure 6, Item 10) on demand valve (Figure 6, Item 7).
4. Install new O-ring (Figure 6, Item 13), hydraulic line (Figure 6, Item 9), two split flanges (Figure 6, Item 12), and
four machine bolts (Figure 6, Item 11) on demand valve (Figure 6, Item 7).
5. Install new O-ring (Figure 6, Item 6), hydraulic line (Figure 6, Item 1), two split flanges (Figure 6, Item 4), and
four machine bolts (Figure 6, Item 8) on demand valve (Figure 6, Item 7).
6. Install new O-ring (Figure 6, Item 2), hydraulic line (Figure 6, Item 5), two split flanges (Figure 6, Item 14), and
four machine bolts (Figure 6, Item 3) on demand valve (Figure 6, Item 7).
7. Check and refill hydraulic reservoir to correct level (WP 0016).
8. Turn battery disconnect switch to ON position and start engine.
9. Operate hydraulic equipment and check demand valve and lines for leaks.
Figure 6. Demand Valve, Passenger Side.
0073
END OF TASK
END OF WORK PACKAGE
0073-9/(10 blank)