• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REASSEMBLY OF 1st AND 3rd SHAFT - Cotninued
REASSEMBLY OF 1st AND 3rd SHAFT - Continued

Maintenance Manual For Loader, Scoop Type, Ded, 4 X 4, Articulated Frame Steer, 4 1/2 To 5 Cubic Yard Clark Model 175 B
Page Navigation
  288    289    290    291    292  293  294    295    296    297    298  
img
Figure 80
Install front taper bearing on output shaft.
Figure 83
Apply a thin coat of Permatex No. 2 on the outer dia-
meter of the output shaft oil seal. Press oil seal, lip of
seal inward, into output shaft bearing cap.
Install a new "O" ring on output shaft bearing cap,
lubricate ring with automatic transmission fluid. Install
bearing cap and shims, do not tighten bearing cap
bolts. Disengage disconnect shaft from output shaft.
Figure 81
With new "O" ring in position install disconnect as-
sembly on transmission case.
Figure 84
Figure 82
Using an inch pound torque wrench on the disconnect
Install disconnect bolts and lockwashers and tighten
flange nut, determine the amount of torque required
35 to 45 ft. lbs. torque. [4,8 - 6,2 m.kg].
to turn gear train.
-33-


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.