• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Second (Optional) Method
Brake Adjustment

Maintenance Manual For Loader, Scoop Type, Ded, 4 X 4, Articulated Frame Steer, 4 1/2 To 5 Cubic Yard Clark Model 175 B
Page Navigation
  385    386    387    388    389  390  391    392    393    394    395  
img
34. Some axles use thrust ring in end of spindle. If pro-
lbs. (reading on pull scale) equals 21 1 in. 1bs. Divid-
vided, tap thrust ring into spindle until it is fully
ing by 12 equals approximately 17 ft. Ibs. which is
seated [Fig. 188).
within specifications of 15 to 20 ft. Ibs. rotating
torque for new bearings.
35. Install planet carrier "O" ring on planet carrier as-
sembly, and install planet carrier assembly on hub
with bolts and lockwashers. Tighten bolts to specified
torque (Fig. 189).
32. Install nut lock and outer nut and tighten securely
as shown in Fig. 182 to lock inner nut in position. Re-
check rotating preload torque by one of two methods
outlined above.
Bend two tangs of nut lock against Rats on inner nut
33
and bend two tongs against flats of outer nut (Fig.
187).
36. Position sun gear on axle shaft; secure with sun gear
retaining ring (Fig. 190).
[53]


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.