OPERATING TECHNIQUESLoading RockTM 5-3805-258-10in a Quarry3. Maintain level cuts, while movingforward, by raising and lowering the bucket.4. When the bucket is loaded, tilt it backagainst the stops. Carry the loaded bucketapproximately 40 cm (15 inches) abovethe ground when moving to the dump area.WARNINGStay at a safe distance during blasting,and until the face is clear.Make absolutely sure that the loading areais safe before entering.Remove any overhang and watch for slid-ing material.If falling rock is encountered, quickly moveas far away from the quarry face aspossible.1. Start loading at the base of the rockpile. Very large boulders may have tobe loaded individually.57
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business