POWER TRAIN
TM 5-3805-258-24-2
DISASSEMBLY AND ASSEMBLY
SEPARATION OF TORQUE CONVERTER
AND TRANSMISSION FROM ENGINE
SEPARATIONOF TORQUE CONVERTER AND
TRANSMISSIONFROM ENGINE 3000 & 1000-29
Tools Needed
A
B
9S8500
Engine Stand
1
6V3145
Load Leveler
1
1.
2.
3.
4.
5.
6.
start by:
a) remove engine, torque converter and trans-
mission
Put the engine, torque converter and transmis-
sion in position on tool (A) as shown.
Disconnect the wire from sending unit (1).
Remove tube assemblies (2) that connect the
transmission oil cooler to the torque converter
and the transfer gear case.
Install ¾-10 NC eyebolt (4) in the housing as
shown.
Put tool (B) in position on transmission and
torque converter.
Remove bolts (5) and make a separation of
transmission and torque converter (3) from the
engine. The weight of the transmission and tor-
que converter is 743 kg (1650 lb.).
CONNECTION OF TORQUE CONVERTER AND
TRANSMISSION TO ENGINE 3000 & 1000-29
Tools Needed
A
B
9S8500
Engine Stand
1
6V3145
Load Leveler
1
1.
2.
3.
4.
5.
6.
Install a ¾- 10 eyebolt (1) and put tool (B) in
position on transmission and torque converter
housing (3) as shown.
Install O-ring seal (2) on the transmission case.
Make an alignment of the flywheel and the
torque connection of transmission and torque
converter (3) to the engine. Install the bolts.
Connect the wire to sending unit (4).
Make sure the O-ring seals are in position on
tube assemblies (5).
Install tube assemblies (5).
J.*J1 by:
Install engine, torque converter and trans-
mission
5-235