TM 5-3805-258-24-2POWER TRAINDISASSEMBLY AND ASSEMBLY71.72.73.74.TRANSMISSIONInstall four discs (89) and three plates (90)(second speed) in the gear. Start and stop witha disc.Install gear (91) as shown.Install ring (92) in the groove of the shaft withtool (A) as shown.Heat carrier (94) to a temperature of 127° to166° C (260° to 330° F) for a maximum of tenminutes and install it on housing (95) so thepart number can be seen. Install the pinto holdcarrier (94) in position. Install rings (93) on thecarrier as shown.NOTE: Use the method below only for non-metalrings to make them ready for installation.FIGURE 1. CORRECT METHOD TO MAKE(NON-METAL) NEW RINGS READY FORINSTALLATIONFIGURE 2. WRONG METHOD TO MAKE(NON-METAL) NEW RINGS READY FORINSTALLATION5-291
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business