TM 5-3805-262-10
2-18. PREPARATION FOR MOVEMENT (CONT
.
b . Towing the Loader (Cont).
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
Raise loader lift arms using chain hoist or lifting device.
Install transport bracket, stored in
tool box, on either lift cylinder
assembly rod and secure using
capscrew and nut.
Place LIFT ARM control lever
in LOWER position. Lift cyl-
inder assembly rod will re-
tract and bucket will lower
until rod eye is resting on
transport bracket.
Attach chain hoist or other suitable
lifting device to loader bucket cen-
ter tooth.
Place BUCKET control lever in CROWD position and use chain hoist to roll
bucket back.
Secure bucket assembly in rollback
position using 12 foot length of
chain with a hook on each end. Po-
sition one chain hook on center
bucket tooth and lift arm brace as
shown. Place BUCKET control lever
in NEUT. position.
Disconnect chain hoist or lifting
device from loader bucket.
Go to step (3) below.
(2)
If engine can be started:
(a)
(b)
(c)
(d)
Start engine and raise bucket one foot off ground using LIFT ARM control
lever in RAISE position then return to NEUT. position.
Using BUCKET control lever in CROWD position, rollback bucket completely
then return BUCKET control lever to NEUT. position.
Secure bucket assembly in rollback position using 12 foot length of
chain with a hook on each end. Position one chain hook on center bucket
tooth and lift arm brace as shown.
Install transport bracket, stored in tool box, on either lift cylinder
assembly rod and secure using capscrew and nut.
2-60