TM 5-3805-262-2011-3. LINES AND FITTINGS MAINTENANCE (CONT)c. Control Valve Assembly to Loader Bucket Assembly.This task covers removal,c l e a n i n g , i n s p e c t i o n , a n d i n s t a l l a t i o n o f h o s e s , l i n e s,and fittings located betweencontrol valve assembly and loader bucket assembly.TOOLS: No. 1 Common Organizational Maintenance Tool KitFixed open end wrench setSocket wrench set, 3/8 inch driveMATERIALS/PARTS: Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)Detergent (Appendix C, item 3)Hydraulic oil (Appendix C, item 13)0-rings, two (FSCM 10988 PN 218-5010)NOTEPRELIMINARY PROCEDURE: Engine right side panels removed (page 9-14) andhydraulic reservoir drained (page 11-79).REMOVAL (SHEET 1 OF 3)NOTETo prevent foreign matter from entering hydraulic system, plug and captubes and hoses disconnected or removed in following steps.I n f o l l o w i n g s t e p s,i d e n t i f y a n d t a g a l l h o s e s a n d l i n e s b e f o r e d i s-connecting and removing to aid in installation.(1)(2)(3)(4)(5)(6)(7)At right side of loader, loosen and disconnect hose fitting (l).At left side of loader, loosen and disconnect hose fitting (2).At control valve assembly,loosen and disconnect two tube fittings (3 and4 ).A t l e f t o r r i g h t s i d e o f l o a d e r,loosen and remove nut (5), lock washer(6), and capscrew (7). Remove clamp (8).Repeat step (4) above to remove clamp (8) on opposite side of loader.Remove tubes (9 and 10) from loader.If necessary, remove two fittings (11) and 0-rings (12) from controlvalve assembly ports. Discard 0-rings.11-32
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business