TM 5-3805-262-20
11-3. LINES AND FITTINGS MAINTENANCE (CONT)
c. Control Valve Assembly to Loader Bucket Assembly ( c o n t ).
REMOVAL (SHEET 2 OF 3)
(8) At right side of loader, loosen and disconnect hose fitting (13). Remove
hose (14) from loader lift arm.
(9) Loosen and remove nut (15), lock washer (16), washer (17), and capscrew
(18). Remove clamp (19).
(10) If necessary, loosen and remove capscrew (20), lock washer (21), washer
(22), and nut (23). Remove bracket (24).
(11) Repeat steps (8) through (10) above to remove other hose (14), clamp
(19), and bracket (24) from left side of loader.
11-34