TM 5-3805-262-205-9. BATTERIES AND CABLES MAINTENANCE (CONT)b. Slave Receptacle.This task covers removal, cleaning, inspection, andi n s t a l l a t i o n o f s l a v e r e c e p t a c l e.TOOLS: No. 1 Common Organizational Maintenance Tool KitCombination box and open end wrench setScrewdriverSocket wrench set, 3/8 inch driveMultimeterMATERIALS/PARTS: Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)Detergent (Appendix C, item 3)Insulation tape (Appendix C, item 5)Isopropyl alcohol (Appendix C, item 15)Electrical cleaner (Appendix C, item 19)Electrical sealer (Appendix C, item 20)PERSONNEL REQUIRED: Two Construction Equipment Mechanic’s MOS 62BNOTEPRELIMINARY PROCEDURE: Battery ground cable disconnected (page 5-148).REMOVAL (SHEET 1 OF 2)(1)Inside battery compartment, behind left stop light, loosen and remove twocapscrews (1) and lock washers (2).(2) Tag and disconnect cables (3 and 4).5-154
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business