TM 5-3805-290-10
RAIL TIEDOWN PROCEDURES ON A DODX RAIL CAR - CONTINUED
0024 00
924G WHEEL LOADER WITH FORKS AND 2-1/2-YARD BUCKET - CONTINUED
8.
Secure loader using two tiedown chains installed in step 5 and two additional tiedown chains on each rear tiedown pro-
vision. A total of nine tiedown chains should secure loader. All tiedown chains should be positioned to achieve approxi-
mately a 45-degree angle from horizontal; front tiedown chains should be positioned as close to bucket teeth as possible.
Front tiedown chains may not achieve desired tiedown angle due to restrictions of bucket and tire (as shown).
9.
Ensure parking brake is set and gear selector is placed in N (NEUTRAL) position. Ensure all doors, access doors, and
panels are secure.
10.
Items are now ready to ship by rail.
427-B2138
FOL Rear Tiedowns.
END OF WORK PACKAGE
0024 00-3/(0024 00-4 Blank)