• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LOADING MACHINE ON SHIP
AIR TRANSPORT BY C-130 AND C-141 AIRCRAFT

Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose Clamshell Bucket 4-Wheel Drive Model 924G
Page Navigation
  233    234    235    236    237  238  239    240    241    242    243  
img
. . .
TM 5-3805-290-10
MARINE TRANSPORT (RO/RO PROCEDURES) - CONTINUED
0025 00
UNLOADING MACHINE FROM SHIP - CONTINUED
00025 00
WAR N I N G
Always use a ground guide when operating machine down ramp to unload from trailer. Failure to use a
ground guide may cause injury or death to personnel or damage to equipment.
When operating machine down ramp, drive with extreme caution and in 1st gear ONLY. Failure to fol-
low this warning may cause injury or death to personnel or damage to equipment.
With ground guide assistance, negotiate ramps in 1st gear ONLY.
8.
9.
Park machine clear of ship loading/unloading zone (WP 0005 00).
10.
Inspect machine to ensure it is operational. Perform Before operation PMCS (WP 0011 00 and WP 0012 00).
END OF WORK PACKAGE
0025 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.