• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR TRANSPORT BY C-5 AND C-17 AIRCRAFT - CONTINUED
CONFIGURE MACHINE FOR TRANSPORT - CONTINUED

Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose Clamshell Bucket 4-Wheel Drive Model 924G
Page Navigation
  240    241    242    243    244  245  246    247    248    249    250  
img
. . . . . . . . . . . . . . . . . .
18
TM 5-3805-290-10
CONFIGURE MACHINE FOR TRANSPORT
0028 00
THIS WORK PACKAGE COVERS
Introduction; Tools and Equipment; ROPS/FOPS Removal; Exhaust Stack Removal; Counterweight Removal, Installa-
tion; ROPS/FOPS Installation; Exhaust Stack Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
Basic Issue Items (Table 2, WP 0030 00)
MOS 21E, Heavy Construction Equipment Opera-
Notify  Unit  Maintenance  to  bring  general
tor
mechanic's tool kit, common no. 1 shop equip-
MOS 62B, Construction Equipment Repairer (2)
ment, field maintenance shop equipment, torque
wrench (P/N 162-8718), and nylon strap (400-lb
capacity)
References
Lifting equipment, 1,650-lb capacity
WP 0004 00
Materials/Parts
WP 0011 00
Cleaning compound, windshield (Item 3, WP 0031
00)
WP 0012 00
Materials/Parts - Continued
WP 0022 00
Oil, lubricating (Item 10, WP 0031 00)
WP 0023 00
Strap, tiedown (Item 14, WP 0031 00)
Tag, marker (Item 15, WP 0031 00)
WP 0025 00
INTRODUCTION
1.
This work package describes how to configure the machine for transport on highway (WP 0022 00), OCONUS (GIC)
rail (WP 0023 00), and C-130/C-141 aircraft (WP 0025 00), and how to return machine to operational configuration
after transport.
N OT E
These procedures are included in this manual as a reference. This does not authorize performance by
the operator.
2.
Assistance from two Unit Maintenance mechanics is required to configure the machine for transport.
0028 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.