22
TM 5-3805-290-23-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
INCLUDING LUBRICATION INSTRUCTIONS
THIS WORK PACKAGE COVERS
Preventive Maintenance Checks and Services
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Oil, lubricating, OE/HDO-40 (Item 33, WP 0206
Unit
Tools and Special Tools
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Shop equipment, common no. 1 (Item 77, WP 0205
Materials/Parts
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Equipment Conditions
Cleaning compound, solvent, type III (Item 9, WP
Machine parked on level ground (TM 5-3805-290-
10)
Work tool lowered to ground (TM 5-3805-290-10)
Detergent, general purpose, liquid (Item 15, WP
Parking brake engaged (TM 5-3805-290-10)
Engine shut down (TM 5-3805-290-10)
Wheels chocked
Battery disconnect switch in OFF position (TM 5-
3805-290-10)
Hydraulic system pressure relieved (TM 5-3805-
290-10)
Estimated Time to Complete Task
Refer to Table 1 for man-hours required to com-
Oil, lubricating, OEA-30, Arctic (Item 32, WP
plete lubrication services