• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY CABLES REPLACEMENT - CONTINUED
BATTERY CABLES REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  266    267    268    269    270  271  272    273    274    275    276  
img
TM 5-3805-290-23-2
BATTERY CABLES REPLACEMENT - CONTINUED
0079 00
INSTALLATION
1.
Install washer (30), cable (31), and nut (29) on machine near battery disconnect switch.
2.
Position cable (9) on right side of machine.
3.
Install two clips (28) on cable (9) and secure with two washers (27) and bolts (26).
4.
Install washer (24), cable (25), and nut (22) on machine underneath starter.
5.
Position cable (11) on left side of machine.
6.
Install five clips (22) and washers (21) on cable (11) and secure with bolts (2).
7.
Install clip (18) on cable (19) and secure to machine near NATO slave receptacle with washer (17) and bolt (16).
8.
Position cable (10) on rear of machine.
9.
Install two clips (15) on cable (10) and secure with two washers (14) and bolts (13).
10.
Install cables (9, 10, and 11) in two cable clamps (12) and tighten two bolts (8).
427-B0880
0079 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.