• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PIN COUPLER CYLINDER REPLACEMENT - CONTINUED
BUCKET CYLINDERS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  666    667    668    669    670  671  672    673    674    675    676  
img
. . . . . . . . . . . . . . . . .
6
TM 5-3805-290-23-2
BUCKET CYLINDERS REPLACEMENT
0139 00
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Personnel Required
Maintenance Level
Unit
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanic's (Item 96, WP 0205 00)
Shop equipment, common no. 1 (Item 77, WP 0205
Machine parked on level ground (TM 5-3805-290-
00)
10)
Shop equipment, welding (Item 79, WP 0205 00)
Work tool lowered to ground (TM 5-3805-290-10)
Lifting equipment, 100-lb capacity
Parking brake engaged (TM 5-3805-290-10)
Materials/Parts
Cap set, protective (Item 8, WP 0206 00)
Wheels chocked
Oil additive, hydraulic (Item 31, WP 0206 00)
Battery disconnect switch in OFF position (TM 5-
Oil, lubricating, OEA-30, Arctic (Item 32, WP
3805-290-10)
0206 00)
Hydraulic tank drained (WP 0137 00)
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
00)
Drawings Required
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
0206 00)
TM 5-3805-290-23P, Figure 151
Rag, wiping (Item 41, WP 0206 00)
Estimated Time to Complete Task
Tag, marker (Item 54, WP 0206 00)
0.3 hr ea
O-ring (4)
0139 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.