26
TM 5-3805-290-23-2
HYDRAULIC TANK AND MOUNTING REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Disassembly, Cleaning and Inspection, Assembly, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Unit
Spill containment unit, hazardous material (Item
Tools and Special Tools
Shop equipment, common no. 1 (Item 77, WP 0205
Gasket
O-ring (14)
Personnel Required
Lifting equipment, 240-lb capacity
MOS 62B, Construction Equipment Repairer (2)
Materials/Parts
Equipment Conditions
Hydraulic pressure relieved (TM 5-3805-290-10)
Cleaning compound, solvent, type III (Item 9, WP
Hood and side covers between cab and engine
Oil, lubricating, OEA-30, Arctic (Item 32, WP
Drawings Required
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
TM 5-3805-290-23P, Figures 51, 146, and 152
Estimated Time to Complete Task
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
8.0 hr