• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEERING FRAME LOCK CONNECTION AND DISCONNECTION
CIRCUIT BREAKER AND FUSES RESET/REPLACE

Operators Manual For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  216    217    218    219    220  221  222    223    224    225    226  
img
TM 5-3805-291-10
STEERING FRAME LOCK CONNECTION AND DISCONNECTION - CONTINUED
0015 00
CONNECTION
1.
Remove retainer pin from pin.
427-C0007
2.
Move steering frame lock into position at front frame section.
WARN I N G
Stand clear of frame articulation area when machine is operating. There is no clearance for personnel in
this area when machine turns. Crushing could occur, resulting in injury or death to personnel.
N OT E
It may be necessary to move front frame
section to align pin bores.
3.
Install pin and retainer pin.
427-C0008
DISCONNECTION
1.
Remove retainer pin from pin.
2.
Move steering frame lock to stowed position on rear frame section.
3.
Install pin and retainer pin.
END OF WORK PACKAGE
0015 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.