• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Line Relief Valves Adjustment - Continued
RIDE CONTROL PRESSURE EQUALIZATION TIME ADJUSTMENT

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1071    1072    1073    1074    1075  1076  1077    1078    1079    1080    1081  
img
TM 5-3805-291-23-1
HYDRAULIC SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS - CONTINUED
0017 00
RELIEF VALVE (LINE) TEST AND ADJUSTMENT - CONTINUED
Line Relief Valves Adjustment - Continued
a.
Loosen locknut (31) and turn adjustment screw (32) clockwise to increase and counterclockwise to decrease pres-
sure setting of line relief valves (30). One turn of adjustment screw will change line relief valves pressure by 100
psi (690 kPa).
b.
While holding adjustment screw (32), tighten locknut (31) to 106 9 lb-in. (12 1 Nm).
427-C0966
427-C0963
0017 00-67


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.