• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RELIEF VALVE (LINE) TEST AND ADJUSTMENT
Testing Line Relief Valves (Auxiliary) - Continued

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1066    1067    1068    1069    1070  1071  1072    1073    1074    1075    1076  
img
TM 5-3805-291-23-1
HYDRAULIC SYSTEM TESTS, INSPECTIONS, AND ADJUSTMENTS - CONTINUED
0017 00
RELIEF VALVE (LINE) TEST AND ADJUSTMENT - CONTINUED
Testing Line Relief Valves (Auxiliary)
Enter service mode. Refer to Implement Hydraulic Service Mode in this work package.
1.
2.
Ensure control levers are in HOLD position.
3.
To relieve pressure in hydraulic tank (22), press and hold plunger on breaker relief valve (23).
427-C0935
4.
Install test stand on remote main relief valve (26) pressure tap (27).
427-C0954
427-C0956
5.
Start and run engine at low idle with transmission in NEUTRAL (TM 5-3805-291-10).
0017 00-62


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.