• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR INTAKE ASSEMBLY HOSES AND LINES REPLACEMENT - CONTINUED
TURBOCHARGER ASSEMBLY, AIR LINES, AND OIL LINES REPLACEMENT

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1206    1207    1208    1209    1210  1211  1212    1213    1214    1215    1216  
img
TM 5-3805-291-23-1
AIR INTAKE ASSEMBLY HOSES AND LINES REPLACEMENT - CONTINUED
0031 00
INSTALLATION - CONTINUED
30.
Connect boost pressure sensor (WP 0074 00).
WAR N I N G
Before operating the machine, secure the steering frame lock in the stowed position. DO NOT operate
machine with steering frame lock connected. Failure to lock steering frame lock into the stowed position
before operating can result in loss of steering and injury or death to personnel.
31.
Secure steering frame lock in stowed position (TM 5-3805-291-10).
32.
Start engine (TM 5-3805-291-10).
33.
Run engine until normal operating temperature is reached (TM 5-3805-291-10).
34.
Verify correct operation of machine (TM 5-3805-291-10).
35.
Shut down engine (TM 5-3805-291-10).
END OF WORK PACKAGE
0031 00-11/(0031 00-12 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.