10
TM 5-3805-291-23-1
TURBOCHARGER ASSEMBLY, AIR LINES, AND OIL LINES REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Personnel Required
MOS 62B, Construction Equipment Repairer (2)
Unit
References
Tools and Special Tools
Tool kit, general mechanic's, automotive (Item 90,
Shop equipment, automotive maintenance and
repair: organizational maintenance, common no.
Wrench, torque, click, ratcheting, 3/8" drive, 75 lb-
Lifting equipment, 100-lb capacity
WP 0189 00
Materials/Parts
Equipment Conditions
Machine parked on level ground (TM 5-3805-291-
Cleaning compound, solvent, type III (Item 7, WP
10)
Work tool lowered to ground (TM 5-3805-291-10)
Detergent, general purpose, liquid (Item 9, WP
Parking brake engaged (TM 5-3805-291-10)
Oil, lubricating, OE/HDO-5/40 (Item 27, WP 0233
Wheels chocked
00)
Battery disconnect switch in OFF position (TM 5-
Oil, lubricating, OE/HDO-15/40 (Item 28, WP
3805-291-10)
Hood opened (TM 5-3805-291-10)
Oil, lubricating, OEA-30, Arctic (Item 29, WP
Steering frame lock connected (TM 5-3805-291-
10)
Oil, lubricating, refrigerant compressor: Synthetic
Drawings Required
TM 5-3805-291-23P, Figures 17, 29, and 30
Estimated Time to Complete Task
Gasket (3)
4.0 hr complete
0.5 hr turbocharger only
O-ring (3)