• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
COOLING SYSTEM LINES REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1272    1273    1274    1275    1276  1277  1278    1279    1280    1281    1282  
img
TM 5-3805-291-23-1
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
0043 00
INSTALLATION - CONTINUED
11.
Connect hose and tube assembly (32) to engine port
and tighten clamp (31).
12.
Connect hose (29) to radiator drain valve (30) and
tighten clamp (28).
N OT E
Do not tighten tiedown strap until after
performing step 22.
13.
Install new tiedown strap (27) loosely around hoses
(29 and 11).
427-C0388
14.
Connect hose and tube assembly (26) to engine port and tighten clamp (25).
15.
Install connector (24) on engine port.
16.
Connect hose (22) to connector (24) and tighten clamp (23).
17.
Connect hose (22) to radiator top tank (10) and tighten clamp (21).
0043 00-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.