• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
THERMOSTAT REPLACEMENT

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1274    1275    1276    1277    1278  1279  1280    1281    1282    1283    1284  
img
.
TM 5-3805-291-23-1
COOLING SYSTEM LINES REPLACEMENT - CONTINUED
0043 00
INSTALLATION - CONTINUED
20.
Connect hose (17) to cooling package assembly and tighten clamp (16).
21.
Connect hose (15) to cooling package assembly and tighten clamp (14).
N OT E
Tighten tiedown strap installed in step 13 after performing step 22.
22.
Insert hose (11) through retaining clip (13) and connect to radiator filler cap (12).
23.
Install T (8) on radiator top tank (10).
24.
Install new O-ring (9) and connect hose (7) to T (8). Tighten clamp (6).
25.
Install new O-ring (5) and connect hose (2) to T (8). Tighten clamp (4).
26.
Install T (3) on cooling package.
27.
Connect hose (2) to T (3) and tighten clamp (1).
427-C0386
28.
Fill cooling system (WP 0041 00).
END OF WORK PACKAGE
0043 00-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.