• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ALTERNATOR REPLACEMENT
ALTERNATOR REPLACEMENT - CONTINUED

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1286    1287    1288    1289    1290  1291  1292    1293    1294    1295    1296  
img
TM 5-3805-291-23-1
ALTERNATOR REPLACEMENT - CONTINUED
0046 00
REMOVAL
N OT E
Tag wires prior to removal to ensure correct installation.
Wipe area clean around component before removal.
1.
Cut and discard tiedown strap (1) on cable assembly (2).
2.
Pull back cable cover (3).
3.
Remove cable nut (4) and lockwasher (5) from cable assembly (2). Discard lockwasher.
4.
Remove ground bolt (6), washer (7), lockwasher (8), and ground wire (9) from alternator (10). Discard lockwasher.
5.
Disconnect regulator wiring harness connector (11) from alternator (10).
6.
Remove four bolts (12), washers (13), and alternator (10) from machine.
427-C0067
7.
If replacing alternator (10), remove locknut (15),
washer (16), and alternator pulley (14) from alternator
(10).
8.
Set alternator pulley (14) aside for reuse.
427-C1593
0046 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.