• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ALTERNATOR REPLACEMENT - CONTINUED
BELT TENSIONER AND IDLER PULLEYS REPLACEMENT

Field Maintenance Manual 1 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1287    1288    1289    1290    1291  1292  1293    1294    1295    1296    1297  
img
.
TM 5-3805-291-23-1
ALTERNATOR REPLACEMENT - CONTINUED
0046 00
INSTALLATION
1.
If removed, install alternator pulley (14), washer (16), and locknut (15) on alternator (10).
2.
Position alternator (10) on engine and install four washers (13) and bolts (12).
3.
Connect regulator wiring harness connector (11) to alternator (10).
4.
Position ground wire (9) on alternator (10) and install new lockwasher (8), ground bolt (6), and washer (7). Tighten
ground bolt to 39 9 lb-in. (4.4 1.0 Nm).
5.
Position cable assembly (2) and install new lockwasher (5) and cable nut (4) on alternator (10). Tighten cable nut to
13 2 lb-ft (18 2 Nm).
6.
Install cable cover (3) on cable assembly (2).
7.
Install new tiedown strap (1) on cable assembly (2).
8.
Connect battery cables to batteries (WP 0096 00).
9.
Install serpentine belt (WP 0048 00).
10.
Verify correct operation of alternator (TM 5-3805-291-10).
END OF WORK PACKAGE
0046 00-3/(0046 00-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.