• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTRUMENT PANELS AND SWITCHES REPLACEMENT - CONTINUED
INSTRUMENT PANEL INSTALLATION

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  49    50    51    52    53  54  55    56    57    58    59  
img
TM 5-3805-291-23-2
INSTRUMENT PANELS AND SWITCHES REPLACEMENT - CONTINUED
0055 00
INSTRUMENT PANEL REMOVAL
C AU T I O N
Tag wiring harnesses prior to removal to ensure correct installation.
1.
Remove 12 screws (16) from instrument panel (17).
2.
Remove instrument panel (17) from duct (18).
3.
Disconnect 10 wiring harnesses (19) from instrument
panel (17).
4.
Remove instrument panel (17) from machine.
427-C0080
0055 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.