• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTRUMENT PANEL REMOVAL
SWITCH REMOVAL AND INSTALLATION

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  50    51    52    53    54  55  56    57    58    59    60  
img
TM 5-3805-291-23-2
INSTRUMENT PANELS AND SWITCHES REPLACEMENT - CONTINUED
0055 00
INSTRUMENT PANEL INSTALLATION
1.
Position instrument panel (17) on machine.
2.
Connect 10 wiring harnesses (19) to instrument panel
(17).
3.
Install instrument panel (17) on duct (18).
4.
Install 12 screws (16) on instrument panel (17).
427-C0080
0055 00-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.