• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
12V SOCKET REMOVAL AND INSTALLATION
QUICK COUPLER ALARM REMOVAL AND INSTALLATION

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  53    54    55    56    57  58  59    60    61    62    63  
img
TM 5-3805-291-23-2
INSTRUMENT PANELS AND SWITCHES REPLACEMENT - CONTINUED
0055 00
SWITCH REMOVAL AND INSTALLATION - CONTINUED
Engine Start Switch Removal
0055 00
1.
Remove instrument panel (17) to access engine start
switch (27).
2.
Remove screw (28), lockwasher (29), and knob (30)
from engine start switch (27). Discard lockwasher.
3.
Remove nut (31) from engine start switch (27).
4.
Remove engine start switch (27) from instrument
panel (17).
Engine Start Switch Installation
1.
Position engine start switch (27) on instrument panel
(17).
2.
Install nut (31) on engine start switch (27).
3.
Install knob (30), new lockwasher (29), and screw
(28) on engine start switch (27).
4.
Install instrument panel (17).
5.
Verify correct operation of all switches (TM 5-3805-
291-10).
0055 00-13


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.