• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SWITCH REMOVAL AND INSTALLATION
SWITCH REMOVAL AND INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  52    53    54    55    56  57  58    59    60    61    62  
img
TM 5-3805-291-23-2
INSTRUMENT PANELS AND SWITCHES REPLACEMENT - CONTINUED
0055 00
SWITCH REMOVAL AND INSTALLATION - CONTINUED
Rocker Switch Installation
0055 00
1.
Insert switch (24) in panel.
2.
Install applicable panel.
427-C1320
12V SOCKET REMOVAL AND INSTALLATION
0055 00
12V Socket Removal
1.
Remove instrument panel (17) to access 12V socket
(25).
2.
Remove nut (26) from 12V socket (25).
3.
Remove 12V socket (25) from instrument panel (17).
12V Socket Installation
0055 00
1.
Position 12V socket (25) on instrument panel (17).
2.
Install nut (26) on 12V socket (25).
3.
Install instrument panel (17).
427-C1520
0055 00-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.