• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION OIL COOLER LINES REPLACEMENT - CONTINUED
TRANSMISSION OIL COOLER LINES REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  234    235    236    237    238  239  240    241    242    243    244  
img
TM 5-3805-291-23-2
TRANSMISSION OIL COOLER LINES REPLACEMENT - CONTINUED
0102 00
INSTALLATION
N OT E
Apply a thin coat of clean oil to all O-rings before installation.
1.
Position tube (7) on machine.
2.
Install two new O-rings (33), tube (7), flange (32), four washers (31), and bolts (30) on elbow (34).
3.
Position tube (6) on machine.
427-C0338
0102 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.