• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEERING HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
STEERING HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  343    344    345    346    347  348  349    350    351    352    353  
img
.
TM 5-3805-291-23-2
STEERING HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0124 00
INSTALLATION - CONTINUED
25.
Install five new O-rings (22 thru 26) in elbows (12, 14, 16, 18, and 20) and install elbows on machine.
26.
Install new O-ring (21) in hose (5) and connect hose to elbow (20).
27.
Install new O-ring (19) in hose (4) and connect hose to elbow (18).
28.
Position clip (8) and install washer (7) and bolt (6) on machine.
29.
Install new O-ring (17) in hose (3) and connect hose to elbow (16).
30.
Route hose (3) through clip (8).
31.
Install new O-ring (15) in hose (2) and connect hose to bracket (14).
32.
Route hose (2) through clip (8).
33.
Position clip (11) and install washer (10) and bolt (9) on machine.
34.
Install new O-ring (13) in hose (1) and connect hose to elbow (12).
35.
Route hose (1) through clips (11 and 8).
36.
Connect five hoses (1 thru 5) to steering metering pump (WP 0128 00).
427-C0528
0124 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.